Production and quality

Formation and grading that a line can rely on

In production, test equipment is judged by throughput and by whether a rejected cell was actually rejected. The same control platform has to run a fixed end-of-line sequence on the line and a flexible characterisation plan in the lab next door.

FormationCapacity gradingOCV / IR screeningEnd-of-line
Cell and battery manufacturing battery test setup

01 · Context

What the test has to survive

  • Formation and grading at tray level, not cell level
  • Incoming material inspection and in-process sampling
  • Traceability from cell serial number to test record

02 · Requirements

What the specification must state

01

Throughput with traceability

Channel counts that match tray size, with per-cell records retained and exportable.

02

Fixed sequences

Pass/fail limits a line operator can run without editing the test plan.

03

Energy cost

Regenerative channels so discharge energy returns to the loop instead of the room.

03 · Recommended configuration

The series we would quote first

CE-6000

End-of-line sequences and bus verification

5 V to 3000 V
CT/CE-5000

Energy-recovering high-current channels

5 / 10 / 20 / 24 / 30 V
CT/CE-4000

Sampling and incoming inspection

5 / 6 / 10 / 20 V

Representative scenario

Representative scenario: pouch cell formation line

A pilot line runs 256 channels of formation followed by capacity grading. The process engineer needs the grading limits locked, the formation profile adjustable per chemistry, and a shift report that reconciles cells in against cells released.

Scenario describes a typical test programme; it is not a named customer reference.

Request a technical consultation

Tell us the device, the voltage ceiling and the shortest pulse in your plan. You get a series, a configuration and a lead time.

Cell and battery manufacturing

  1. 01Complete the form
  2. 02Your mail client opens addressed to ada.kwok@neware.net
  3. 03Send it, and reply directly to Ada