Electrochemistry
Material screening that survives peer review
Half-cell and full-cell screening produces hundreds of small signals that decide whether a material programme continues. The instrument has to hold microamp stability for weeks and record the transient that the electrode, not the electronics, produced.
01 · Context
What the test has to survive
- Coin cells with capacities in the microamp-hour range
- Experiments that run for months without intervention
- Results that will be compared across batches, cells and operators
02 · Requirements
What the specification must state
Microamp stability
Current ranges that reach 0.1 mA with four-wire sensing, so contact resistance does not enter the data.
Method coverage
GITT, PITT, CV, EIS-compatible auxiliary channels and DCIR on the same timebase.
Long-run integrity
Power-down data retention and offline operation when the host PC restarts.
03 · Recommended configuration
The series we would quote first
Portable, CV capable, 1000 Hz acquisition for in-situ work
Channel density for parallel screening campaigns
When the transient is the result
Representative scenario
Representative scenario: solid-state interface study
A university group runs stack-pressure cells through formation, then GITT, then a two-week hold. The test plan needs negative discharge voltage for symmetric cells, an auxiliary temperature channel sampled with the main channel, and export that separates the diffusion calculation from the cycling record.
Scenario describes a typical test programme; it is not a named customer reference.
Request a technical consultation
Tell us the device, the voltage ceiling and the shortest pulse in your plan. You get a series, a configuration and a lead time.
Material research
